Hybrid planning for challenging construction problems : An Answer Set Programming approach
We study construction problems where multiple robots rearrange stacks of prefabricated blocks to build stable structures. These problems are challenging due to ramifications of actions, true concurrency, and requirements of supportedness of blocks by a surface or a robot and stability of the overall structure at all times. We propose a general elaboration tolerant method to solve a wide range of c